Sunday, August 18, 2013

Nose support repair

The repair at the track was a temporary one. Upgraded the bolts and installed new rivets, that should hold it for a couple of years. Other items preformed was changing the oil and filter, then running up the engine to check for oil and water leaks. All looks good. Next is to work on the gear ratios. I might leave in the Road America ratios, not to far off from what I used at Lime Rock last year.

That’s the bracket I made a couple of years ago. I only used rivets to fasten it to the nose support. What happened at RA last month was the rivets sheared off. That’s why I’m included a bolt in the repair.


No comments: