Monday, June 29, 2015

Left bank done

The left exhaust and all the connetions are done.  Now to the right side.

Saturday, June 27, 2015

Exhaust ready

Repaint the header pipes.  My gear sets arrived yesterday.  Dog rings should not be to far behind.

Wednesday, June 24, 2015

On Schedule

Made good progress these last couple days.  I've ordered 2 dog rings and 3 gear sets.  All should be here early next week.  When the gear box is back together, I can start the engine. In the mean time, a couple of other projects to tackle, then back to the car.


Monday, June 22, 2015

Gear Box

Been gathering information for the proper gear ratios at Laguna Seca.  Talked to a couple of fellow drivers who have competed there.  So I think I have a idea of what I need.

This is the chart I use for gear ratio sets.

Saturday, June 20, 2015

oil lines

Installed the oil pump and working on connecting all the lines.


Thursday, June 18, 2015

Nose/rad. support completed

A little repair on the nose support, and now installed.  At this point, all the water lines are connected and next, the oil lines.
Bottom of the nose support.  Just replacing a few of the rivits.


Tuesday, June 16, 2015

Rear anti roll bar link

Made a replacement for the damage link that happened at Mosport last year.
Just a steel tube with a couple of nuts.
All done.
I'm a little rusty on brazing. Not pretty, but gets the job done.
 If I have the time I'll nickle plate it.



Sunday, June 14, 2015

More stuff

Last of the parts in need of cleaning.  Now to hang them on the car.


Friday, June 12, 2015

Tires

After lettering the inside tires, found a few problems.  But now I know for the outside.  I still have to remove some paint and then sandpaper the raised lettering.


Wednesday, June 10, 2015

Coolant lines and more

Now with the engine in, time to start connecting the oil, fuel and electical.


Monday, June 8, 2015

Engine in

Easy as 1, 2, 3
1

2
3

Saturday, June 6, 2015

Rolex Monterey Participant Information Packet

Just received the "Rolex Monterey Participant Information Packet"

To view Click here



Clean & Shiny

Spent extra time detailing the engine.  It's soo much easier with it out of the car.

Next...install.


Thursday, June 4, 2015

Clutch done

Clutch installed.  Next, clean the engine and get ready for it's installation.


Tuesday, June 2, 2015

New clutch parts

I'm going to just replace the two discs.  Scrapped the idea of replacing the whole package.  Trying to keep things simple, staying with what I know works.