Thursday, February 21, 2019

Left rear upright inspection


Needed to inspect the brake rotor and caliper and the upright.


Some of this studs had come loose.  They lock the tire rim.

Uprights look good as does the axle bearings.

The studs needed a good cleaning.  The brake dust grids into them.

Ready to go, now to the right side.



Sunday, February 17, 2019

Left axle completed

Removed and replaced the rubber donut.  Left side is now completed.




Tuesday, February 12, 2019

Right axle completed

These are the bolts in the axle that always gives me problems.  I was
installing them when one of them broke when tightening.  That is an
older one.  Decided to make all new ones.

Right side is now done.  Onto the left side.

Saturday, February 9, 2019

New fuel pump

New fuel pump installed.  Next job, the rear axle donut.