Saturday, August 31, 2013
Lime Rock, Saturday AM
Yesterday went well. The first session was more of a shakedown making sure the steering and braking was proper. The second session was more fun. Starting to drive the course and remembering turning and braking points. The engine feels like it's producing more power than last year. Today, 2 more sessions. By the way, the paint is still on the Goodyear tires.
Friday, August 30, 2013
Lime Rock Friday AM
Today it's a driver meeting at 9:00 then our first session around 12:00. The weather is looking good for today, but goes down hill for the rest of the weekend. May main concern is the problems that I had at Road America has been repaired.
Thursday, August 29, 2013
A long day
Wednesday, August 28, 2013
Almost ready for Lime Rock
This morning right after loading the car in back of the truck we got hit with a thunderstorm. It’s been raining since then. Lucky for me, most of the truck was already loaded. Thursday weather looks better. Leaving around 9am tomorrow.
Tuesday, August 27, 2013
Turning Avons into Goodyears, con't
I cover the tire with newspaper and spray paint the letters. |
Hand paint the areas that need filling. |
And now before your very eyes, Goodyears appear. |
Turning Avons into Goodyears
I've been working on this off and on. I have a old set of Goodyear tires that came with the car. I'm working on lettering the Avons using the old style Goodyear.
The tires have raised lettering and I coat them with paint. |
Next I place clear tape over the letters and press down. |
Now I place the tape on thin cardboard. |
With a knife I cut out each letter. |
Now I tape down the cardboard and ready the tire for paint. More tomorrow. |
Saturday, August 24, 2013
Lime Rock Park
Everything is on schedule for Lime Rock. The to do list is done for the car and most of the support equipment and parts are still on the truck.
Monday, August 19, 2013
Geneva trip
Sunday, August 18, 2013
Nose support repair
The repair at the track was a temporary one. Upgraded the bolts and installed new rivets, that should hold it for a couple of years. Other items preformed was changing the oil and filter, then running up the engine to check for oil and water leaks. All looks good. Next is to work on the gear ratios. I might leave in the Road America ratios, not to far off from what I used at Lime Rock last year.
Saturday, August 10, 2013
Water line
Moved the water line forward, away from the oil pump belt. It must of been moved toward the rear when I used the T190 Lola radiator. No big deal, just loosened up the clamps and a couple of taps with a rubber mallet got it back in place. Just finished up the truck also. Another item on the list was a spare belt and water hose, they should be here Wednesday. Tire choice will be the Avon’s for Lime Rock and the Goodyear’s for Austin.
Problem solved. |
Friday, August 9, 2013
Ball joint done
Received the necessary parts from Eric the other day. In the photo below the part in the middle is the replacement. I only had to remove .080th from the height to make it fit. Installed it and looks right. Might need a small adjustment at Lime Rock, but that’s easy. Next on the list is move the water line away from the oil pump pulley.
Wednesday, August 7, 2013
Ball joint parts
Should have the ball joint parts from Eric today or tomorrow. Continue to work on the replacement parts for the drive shaft from the truck. Bigger job than anticipated because everything was very rusty.
Monday, August 5, 2013
Lime Rock next
Lime Rock event is coming up fast. In just a little over 3 weeks it will be here. I think Lime Rock will end up being a test session for Austin. I really need to be sure the car is ready for that race. Their was going to be another F5000 car at Lime Rock, but it got damage at Road America a couple of weeks ago.
These are the drive shafts from the truck. I have been meaning to replace the u-joints and center bearing. Something that's needed attention for the past couple of years. |
Friday, August 2, 2013
Next problem
Subscribe to:
Posts (Atom)