Saturday, December 12, 2009

What's next?

With the car safely back in the shop, and the holidays fast approaching, not a whole lot will be accomplished till after Christmas. One of the first items on the list, all the new metal pieces must be nickel plated. I'll use the same plating shop that's out by Pittsburgh. No UPS, I'll drive or fly, can't take a chance at this point. The engine has to be removed for the flywheel and clutch installation, then oil lines.
I like to think at this point the major obstacles have been tackled, and the rest is down hill from here on in(fingers crossed).

No comments: