Finally, starting to install parts on the tub. What looked like a 15 min. job turned into 2 hrs. The parts where all nickel plated and as you can see the shift linkage has to slide through spherical bearings. So anywhere there is a tight fit, it had to be lightly sanded and polished, and that also included where the linkage connects. This is definitely an area you don't want binding.
I had weighted a radius rod before and after plating, and it had gain 12 grams, so I guess the nickel plating it just slightly thicker then the original.
No comments:
Post a Comment