Sunday, February 28, 2010
No UPS
Had a few more items including the race battery on order. Schedule for a Friday delivery. With the adverse weather their where no delivery's. I'm sure it will be here Monday.
Friday, February 26, 2010
Snow...Snow...Snow
More snow, 18-24 inch's. Getting tired of the snow. On a more positive note, retrieved the parts that Brian had fabricated from the platers the other day. Paul's Chrome(Bill) did a very nice job on the nickel plating(as always).
With these parts back I could now measure and shorten the 8 stacks that mount on top of the carburetors. The stacks are 1 inch too high and I could not mount the air intake box on top.
Had to shorten all the stacks 1 inch.
Now it fits perfect.
Wednesday, February 24, 2010
Mufflers...Oh No!
The first scheduled event I'm attending has a noise limit of 104 db's. That means mufflers for me. I would skip it because it's the only race this year requiring mufflers, but it's a low key event that makes for a good first race and test session.
The mufflers I need are 5 inch's round
and 18 inch's long. I'm using oatmeal containers as a template,
their the same diameter, but shorter.
As you can see they touch each other.
Won't know the final result until I
get the mufflers and see them installed.
Wiring
Tuesday, February 23, 2010
Fuel pressure gauge done.
The fuel line that runs from the carburetor to the fuel pressure gauge are done. Most of the battery cables that go from the battery to the master switch and then to the starter are done. Plus the external battery hookup cables are done. My last order shorted me 4 feet of battery cable, plus back ordered some wire loom cover. Looks like next week for that stuff.
Monday, February 22, 2010
Throttle cable completed
Throttle cable can now be checked off the list. The only real issue was making a bracket for the return springs. UPS will be dropping off a box today containing a new slave cylinder for the clutch, some lines and fittings for the fuel gauge and battery cable and fittings. A busy week ahead.
Saturday, February 20, 2010
Catch cans
You'll find catch cans on just about every race car. Used to contain fluids such as oil or water from going onto the race track.
The original location for the catch can bracket was on the support for the wing. But I'm not using that support so I make a couple of brackets and mounted on the right side of the transmission. Now to find some cans(plastic) to fit.
Friday, February 19, 2010
Safety panel
Wednesday, February 17, 2010
Now that the smoke has cleared
It's back to work. My ebay purchased fuel pressure gauge came yesterday. It's a perfect fit and match to the oil temp gauge next to it. The gauge came from a marine salvage yard in FL. The slave hydraulic cylinder for the clutch is to far gone to rebuild, so I'm making up another list of parts I need.
Paul's plating called, all the parts are done, so next week it's a trip out to Pittsburgh.
Monday, February 15, 2010
The Big Day Has Arrived!
34 years later, it runs again. Started it up today and runs good, no leaks so that's good news. Could only keep it running for a short time. My work space is very small and after just a couple of minutes my eyes we're burning from the exhaust fumes. But sounds good and one big item to check off on my to do list.
Here's the video. Click on the arrow to start.
Here's the video. Click on the arrow to start.
Or try this link http://www.myf5000.com/lola_engine_run.html
Sunday, February 14, 2010
Cooling system now complete
Friday, February 12, 2010
Oil tank---water lines
Worked on the coolant system plus mounted the oil tank and connected the lines. So, at this point the oil system is complete, coolant system is 85% done and the fuel system for the most part is done. I think next week I have to locate 5 gals of race fuel, add some oil and start her up .
.JPG)
Coolant line from the radiator to the water pump
Thursday, February 11, 2010
Getting closer
The exhaust headers are back on. Oil cooler mounted, oil gauge line completed and installed. Needed a low pressure fuel gauge and found one on ebay, that will arrive next Monday. Next is to reinstall the water lines and work on the throttle cable.
Wednesday, February 10, 2010
Snow!
Tuesday, February 9, 2010
Valve cover breather vents done
Subscribe to:
Posts (Atom)
.jpg)