Sure hope these new(new to me) gear sets and dogs last the event. By all accounts I shouldn't have to to tend to them. Also removing the slack out of the shift linage will be a big plus. Time will tell.
The gears are used, be in very good condition. The dogs are new.
Made good progress these last couple days. I've ordered 2 dog rings and 3 gear sets. All should be here early next week. When the gear box is back together, I can start the engine. In the mean time, a couple of other projects to tackle, then back to the car.
Been gathering information for the proper gear ratios at Laguna Seca. Talked to a couple of fellow drivers who have competed there. So I think I have a idea of what I need.
After lettering the inside tires, found a few problems. But now I know for the outside. I still have to remove some paint and then sandpaper the raised lettering.