Thursday, August 9, 2012
Lime Rock in 3 weeks
Not much to do on the car. What is really left is just routine maintenance. Have some work on the truck, maybe a day or two on that. All in all, looking good.
Monday, August 6, 2012
Set of rains
At last, my rain tires are completed. It wasn't terribly difficult, just time consuming. My never use them, but now at least I have the option.
Saturday, August 4, 2012
3 down 1 left
Friday, August 3, 2012
Oops...ran out of rubber
Started to work on the rear tire. After mounting it, laying out the pattern, I discovered that the tire surface did not contain enough rubber to groove. I realized I had cut into the cords of the tire. Oh well, couple of hours down the drain. Lucky I have 2 other rear tires that look better.
| Started out well, even the rear tire fits on the front. Much easier when the tire can rotate, turn left, and then right. |
Thursday, August 2, 2012
Lime Rock poster wall
At the Lime Rock event I plan on bringing the poster walls. Have one pretty much done. This wall staying with the Lime Rock theme.
Tire number 2 done. Next are the rear tires.
Wednesday, August 1, 2012
1 completed rain tire
Considering it's my first time, I think the tire is usable. At this point I'll work on the other 3 and have a set of rain tires just in case.
| Looks like a rain tire. Started on the second one, now that I have a system it will go faster and look better.
It takes over 400 individual cuts on one front tire.
|
Tuesday, July 31, 2012
The smell of burning rubber
Started on my first soon to be rain tire. There is an art to this, just takes a little practice. I have a pattern that I made so all I have to do is measure and scribe with a yellow marker. The tire grooving iron heats the rubber as you carve out the groove. It does stink.
| Much easier to work with the tire mount on the car. So far not to bad. The most difficult part is to cut the correct line, not all get cut. Should finish this one today. |
Monday, July 30, 2012
Slave clutch cylinder
Replaced with a new clutch cylinder, not sure if the old cylinder was damage when the bolt fell out. Not taken any chances, and this will give me a spare. Hard to see but the 2 bolts retaining the cylinder are safety wired and loctite was applied.
Sunday, July 29, 2012
Paint
Just finished painting the 4 spare rims. I'll hold off polishing them, in a week they would be tarnished.
Saturday, July 28, 2012
The art of tire grooving
Thursday, July 26, 2012
Lime Rock event schedule
Lime Rock event schedule, our race group is 4.
Historic Festival 30 & Sunday in the Park Concours (click here).
Historic Festival 30 & Sunday in the Park Concours (click here).
Wednesday, July 25, 2012
Rim prep
Glass beading and getting ready to paint and polish the spare tire rims I got from Eric. Oh, speaking of Eric, he did make it to Road America but continued to have engine problems.
Tuesday, July 24, 2012
Rain tires
Back to the rain tires. I'm working off of a couple of photos of vintage rain tire patterns. Transferred it to paper and made a bunch of measurements. The tire groover is being delivered Wednesday. I sure hope all this work will make a usable rain tire.
| Once everything gets going , it should go quickly. |
![]() |
| It should look like this when it's done. |
Sunday, July 22, 2012
Another fix
Noticed this problem when the car was at the Pitts-race. The suspension piece was rubbing on the spring perch(photo below). When the upright bearings got replaced in early 2011 by Brian. I placed the cone piece on the wrong side of the upper suspension rod when reinstalling the uprights. All fixed now.
| Not sure how or if it effected handling. |
| This is on the right side. The cone piece in it's proper place. |
| Left side, not in the proper place. |
Saturday, July 21, 2012
Not waisting time
I wasn't really 100% ready for the last event. Making sure it doesn't happen again. Already ordered all the replacement parts needed and a few extra items. Using the same gear ratio for Lime Rock that I used for Pitts. With the 2nd gear dog replaced and hardly used, no need to remove gearbox. High on the priority list is to get my spare tire rims ready for use. Either for drys or rains.
Subscribe to:
Posts (Atom)
