Fine tuning the chassis setup. I don't have any records or settings. But when I disassemble the car I noted and recorded all measurements and reassembled the car using those measurements. They seem close.
Thursday, March 25, 2010
Wednesday, March 24, 2010
A second look
Examining the car a little more closely yesterday, I did discover 2 small leaks. One was a radiator hose that just needed a little tightening. The other was a small fuel leak on the crossover line between the 2 fuel cells. That also got tightened a little more. Will look under the car today for any returning leaks.
Monday, March 22, 2010
At the drags
Saturday, March 20, 2010
Helmet completed
With the exception of a couple of JB decals that go in between the stars, the helmet is done.
I still have my eye on tomorrow for a test day at the drags. It seems the closer I get in completing the car, the more work their is. All those small details that have been left until last. I guess this evening I will know if it's a go.
Thursday, March 18, 2010
Catch cans
Wednesday, March 17, 2010
Tuesday, March 16, 2010
3 weeks to go
Hard to believe only 3 weeks before we leave to our first event. Found a fuel dealer about a hour from the house. Picked up 15 gallons of race fuel at $7.50 per gallon. And I thought aviation fuel was expensive.
.JPG)
.JPG)
.JPG)
Did a little more paint on the helmet and working on some odd and ends.
In order to get even paint lines I use a surface plate(a very flat piece of granite) and a height indicator. I tape a pencil to the height indicator and scribe a line around the helmet.
Then use very narrow painters tape to follow my pencil line. Works real nice.
Saturday, March 13, 2010
Thursday, March 11, 2010
Getting close to the finish line.
The seat belts came yesterday along with some hardware to complete the mounting of the rear wing. Also the push rod for the clutch should be here next Monday.
Spending sometime on the truck now, transporting the car in the back and eliminating the trailer is a plus. The first event is a track that I never raced on. Roebling Roads is a private track in GA. I've down loaded some in car videos from youtube onto my ipod and watch them while I'm on the treadmill.
Spending sometime on the truck now, transporting the car in the back and eliminating the trailer is a plus. The first event is a track that I never raced on. Roebling Roads is a private track in GA. I've down loaded some in car videos from youtube onto my ipod and watch them while I'm on the treadmill.
Tuesday, March 9, 2010
Sunday, March 7, 2010
Last order
What I hope will be the last parts order for awhile should arrive this Wednesday. The seat belts that had been back ordered are on the way with some other small items I needed.
Starting to work on the suspension setup, brake bias and all that fun stuff.
Starting to work on the suspension setup, brake bias and all that fun stuff.
Saturday, March 6, 2010
More mufflers
Thursday, March 4, 2010
Auger muffler insert
Auger mufflers, they slip into the exhaust pipes. Not much to them, I do have to reduce the dia. from 3" to 2 1/2" to fit. It would be nice if they work, I also have mufflers coming this Friday. Between using one or both, I hope this resolves my noise problem.
I've been looking at the idea of taking the car to the local drag strip. There's one about 20 min. from here and they have a test and tune day on Sunday's. This will be my only opportunity to test the engine, gearbox and brakes before my first event in April.
Wednesday, March 3, 2010
Tachometer
Tuesday, March 2, 2010
Wiring done
With the arrival of the battery yesterday, I could now complete the wiring.
Also I needed the push rod on the transmission. This rod is connected to a hydraulic cylinder that works the clutch. Terry at Taylor Race Engineering found one in England. So I should have that item by the end of next week.
Subscribe to:
Posts (Atom)