Friday, February 19, 2010
Safety panel
This panel separates the cockpit from the engine. Most likely fabricated by Zeke Justice. As the series evolved, so did the rule book. The panel serves as a barrier for liquids and fire not to penetrate the drivers cockpit.
.JPG)
.JPG)
.JPG)
Wednesday, February 17, 2010
Now that the smoke has cleared
It's back to work. My ebay purchased fuel pressure gauge came yesterday. It's a perfect fit and match to the oil temp gauge next to it. The gauge came from a marine salvage yard in FL. The slave hydraulic cylinder for the clutch is to far gone to rebuild, so I'm making up another list of parts I need.
Paul's plating called, all the parts are done, so next week it's a trip out to Pittsburgh.
Monday, February 15, 2010
The Big Day Has Arrived!
34 years later, it runs again. Started it up today and runs good, no leaks so that's good news. Could only keep it running for a short time. My work space is very small and after just a couple of minutes my eyes we're burning from the exhaust fumes. But sounds good and one big item to check off on my to do list.
Here's the video. Click on the arrow to start.
Here's the video. Click on the arrow to start.
Or try this link http://www.myf5000.com/lola_engine_run.html
Sunday, February 14, 2010
Cooling system now complete
Friday, February 12, 2010
Oil tank---water lines
Worked on the coolant system plus mounted the oil tank and connected the lines. So, at this point the oil system is complete, coolant system is 85% done and the fuel system for the most part is done. I think next week I have to locate 5 gals of race fuel, add some oil and start her up .
.JPG)
Coolant line from the radiator to the water pump
Thursday, February 11, 2010
Getting closer
The exhaust headers are back on. Oil cooler mounted, oil gauge line completed and installed. Needed a low pressure fuel gauge and found one on ebay, that will arrive next Monday. Next is to reinstall the water lines and work on the throttle cable.
Wednesday, February 10, 2010
Snow!
Tuesday, February 9, 2010
Valve cover breather vents done
Monday, February 8, 2010
Starter motor works
Really had not idea up to this point if the starter motor would fit properly and spin over the engine. Two oil pan bolts need a small modification. But the starter motor works just fine, this is the one I got from St. Louis, it's got to be at least 40 years old.
.JPG)
Needed to grind these 2 bolts, the starter motor was rubbing on them.
.JPG)
Starter works fine.
Needed to grind these 2 bolts, the starter motor was rubbing on them.
Starter works fine.
Saturday, February 6, 2010
Oil lines completed
Received the necessary parts yesterday to finish the oil lines. That's done now. The parts for the oil pressure gauge are all correct. The back order fittings for the valve covers also came. So the next couple of days should be busy ones.
Friday, February 5, 2010
Wired
The nice part about working on the wiring is, it's very straight forward and all the supplies can be purchased at your local auto parts store. Instead of using the solderless wire connectors, all my connections will be soldered. It's a little more work but much more dependable and this is the way it was done in the 1970's. The one thing that is added that wasn't used in the 70's is a fuel pump emergency cut off switch. It's triggered by a sudden stop. Cuts electric to the fuel pump.
The blue connector is the solderless type.
Fuel cutoff switch. It's the one with the red button.
Rain light, hey it works!
Thursday, February 4, 2010
Electrical
While I wait for parts, started to work on the electrical. All this old wire needs to be replaced.
I'm trying to use what the car came with to keep it original, but this stuff is just to dangerous to use again.
Wednesday, February 3, 2010
2 months to go
My first event is in just a couple of months. I'm not in panic mode yet.
Additional parts will arrive this Friday. This should complete the oil lines, a small water line that runs from the radiator to the swirl pot and some fittings to convert metric threads to US for a replaced oil pressure gauge.
Next is to modify the valve cover breather vents to accept lines that will run to the oil tank.
Tuesday, February 2, 2010
Transponder
Monday, February 1, 2010
Fuel system completed
A productive weekend, but a cold one. 5 degrees outside and 35 degrees in the shop. I use 2 small space heaters and it takes about 2 hours to get warm enough to work in.
Anyway, for the fuel system I needed to fabricate 2 brackets to mount the electric fuel pump. I'm sure the car original had a mechanical pump that was driven off the engine. But I don't have fuel injection and a electric pump will be more than adequate. Had all the parts I needed, thought it would take a couple of hours and ended up taking all day, but its done.
Mounting the fuel pump behind the seat.
Completed system